Water & Sewer

Debt payments rise from $1.7M to $6.4M as planned borrowing begins.

Funding · FY2025 → FY2029$14.8M → $16.4MRevenue and incoming transfers
Spending & transfers · FY2025 → FY2029$15.3M → $16.6MIncludes shared services and debt payments
Debt payments · FY2025 → FY2033$1.7M → $6.4MFY2033 is the peak in the supplied schedule

WATER & SEWER

Planned borrowing raises future debt payments.

Water and Sewer funding, spending and debt paymentsFunding and spending are shown from FY2025 through FY2029. Later years show debt payments only. Annual debt peaks at 6.4 million dollars in FY2033. A through J mark the first payments for ten future loans.Cumulative surplus / (shortfall) · $ millions(0.5)(0.7)(1.7)(1.7)(2.0)Funding and spending outlook through FY2029ACTUALTOWN PLAN$0M$5M$10M$15M$20MSpending & transfersFundingFull funding and spending after FY2029have not yet been modeled.The later bars below show debt payments only.FY25FY26FY27FY28FY29FY30FY31FY32FY33FY34FY35FY36FY37FY38FY39Debt payments · $ millionsThrough FY2029, included in “Spending & transfers” above.FY2025 actual / FY2026 estimateExisting loansFuture loans$0M$2M$4M$6M1.7FY252.1FY262.7FY272.9FY28West Fork Eno Reservoir Dam Repairs: payments begin FY2028A3.0FY293.8FY30Eno River Interceptors Upgrade - East: payments begin FY2030BElizabeth Brady Pump Station and Force Main Upgrade: payments begin FY2030C4.8FY31US-70A Business Water Improvements: payments begin FY2031DSewer Equalization Basin: payments begin FY2031EExchange Club Interceptors: payments begin FY2031F5.6FY32Hasell Water Tank Replacement: payments begin FY2032GEno River Interceptors Upgrade - West: payments begin FY2032H6.4FY33Cates Creek Outfall Upgrade: payments begin FY2033IBellevue Mill Interceptor Upgrade: payments begin FY2033J6.3FY345.4FY355.3FY365.3FY375.1FY385.0FY39

Scroll across the chart to see all years.

What the plan assumes. The Town’s FY2027–FY2029 plan assumes 7.5% annual increases in water and sewer rates. Funding and spending are shown through FY2029. Later bars show debt payments only.

What drives the costs?

Running the utilities

Personnel, operations and shared Town services rise from $9.9M in FY2025 to $12.9M in FY2029.

Infrastructure & debt

Ten future loans add payments for repairs, tanks, pipes and treatment-system projects. Debt payments reach $6.4M in FY2033.

Project funding

Through FY2029, spending includes Water & Sewer cash contributions and loan repayments. Project budgets are shown on the linked detail page.

Town plan · projected fund balance

The plan also draws on savings.

$9.3MProjected end-FY2026 balance
$1.3MPlanned use over FY2027–FY2029
$8.0MProjected end-FY2029 balance

Projected fund balance; not a confirmed amount available to spend.

Savings can cover temporary gaps. They do not provide recurring income for growing costs and debt payments.

The Town plan already includes rate increases. The debt payments shown here are part of the costs those rates help fund.

What could this mean for utility bills?

Rising debt payments add pressure to utility rates. The size of future increases will also depend on operating costs, customer revenue, grants, available savings and project choices.

A full funding and spending outlook after FY2029 is still needed to estimate the remaining gap. The debt schedule alone does not determine a future bill.

Choices about project timing, spending and funding can change this outcome.

Stormwater · supporting detail

Stormwater has its own fees, spending and projects. The Town’s FY2029 projection shows:

Funding$1.2M
Spending & transfers$1.3M
Annual result($0.1M)

These figures are separate from the Water & Sewer chart above. Source: FY2027 Recommended Budget, Stormwater financial summary, p. 136.

Discussion prompt

What would you prioritize?

Which utility investments matter most to you? How would you weigh reliability, repairs, project timing and future bills?

These questions are for reflection. To share an idea for private review, visit Your budget priorities →.

Sources & how to read this

Years shown. FY2025 actual; FY2026 estimate; FY2027 recommended budget; FY2028–FY2029 Town projections. Funding and spending end at FY2029. The debt chart continues through FY2039, and the linked loan schedule through FY2048.

Sources. Cryer v52, the FY2025 audit, the Town’s FY2027 Recommended Budget (Water & Sewer financial summary, p. 102; Stormwater, p. 136), and Town-supplied Debt Service Projections.xlsx. The chart preserves the FY2025 amounts in the current Town Ledger model; small source-rounding differences do not affect the displayed figures.

Funding and spending. Funding includes operating-fund revenue and incoming transfers, before use of savings. Spending includes personnel, operations, shared Town services, capital purchases, loan payments and outgoing transfers for projects and reserves. Shared-service costs remain included here because utility customers help fund them. Through FY2029, the debt bars are part of the spending line.

Rates. The Town plan uses 7.5% annual water and sewer rate increases for FY2027–FY2029. FY2028 and FY2029 are planning assumptions, not adopted charges. Project costs should not be added again on top of that rate path. No new rate assumption or full funding projection has been added after FY2029.

Savings. The Town projects balances of $9.3M at the end of FY2026 and $8.0M at the end of FY2029. The $1.3M reduction is the planned use over FY2027–FY2029. These balances are not confirmed amounts available after all commitments and reserve needs.

Loans and timing. The Town’s schedule groups payments into “Existing loans” and planned borrowing (“Future loans”). A–J identify the ten future loans and mark when payments begin, not when construction starts. FY2025 and FY2026 show total payments; loan-by-loan details begin in FY2027. Payments include principal and interest.